REACH Technologies  
English  I  Deutsch  I  Español  I  Français  I  Italiano I  Polski  
Strona główna  |  O nas   |  Klienci  |  Aktualności  |  Alianse  |  Dlaczego Indie?  |  Kariera  |  Kontakt   |   Feedback
 
 
 
 
 
  REACH Planner & Scheduler
Publikacje naukowe
Intelligent manufacturing control in clothing industry. 1997.Źródło: Engineering Focus

Quick response in the textile-apparel industry and the support of information technologies. 1997.Źródło: Engineering focus

Implementation of a dynamic scheduler for apparel computer integrated manufacturing system. Gracanin, D.; Valvanis, K.P.; et al Lafayette LA , USA . Jnl Intelligent Manufacturing, Apr 1997, 8(3), 67-81Źródło: British Library

Scheduling flexible manufacturing systems for apparel production. Oct. 1996.Źródło: Engineering focus

The inside story on bridging the QR gap. Rosen, F.K. Mar 1993, 34(7), 50-56,Źródło: Bobbin

Supply chain management for quick response in the clothing industry. 1996.Źródło: Engineering focus

The benefits of the computer-aided design and manufacture [of apparel]. Gray, S. London , UK . Design Council, ISBN: 0-85072-307-8, 54 pp.Źródło: British Library

Logistics in the [apparel] factory. Brecht, C.P. Knitting Technique, Nov 1993, 15(6), 397-400.Źródło: British Library

Comparison of apparel production systems: a simulation. Oliver, B.A.; Kincade, D.H.; Albrecht, D. Fort Collins CO, USA . Clothing & Textiles Research Jnl, 1994, 12(4), 45-50.Źródło: British Library

Computers in clothing. Tait, N. Bassett , UK Apparel International, Jul 1993 (July/Aug). 8, 9, 11, 13Źródło: British Library

A practical approach to the apparel production-planning and scheduling problem. Chen, C.; Racine, R.;.Swift, F. Miami FL, USA. Int Jnl Clothing Science & Technology 1992, 4(2/3), 9-17.Źródło: British Library

Quick response management system for the apparel industry: definition through technologies Kincade, D.H. Blacksburg VA, USA Clothing & Textiles Research Jnl, 1995, 13(4), 245-251.Źródło: British Library

Selecting A New Production Control System. Tait, Niki. Apparel international: The Journal of the Clothing and Footwear Institute FEB 01 1994 v 25 n 2 30 Summer: review to help the manufacturer through the complexities of production control decision making.Źródło: Uncover

Modular makes a hit in cutting Peng, T.W. Jul 1993, 34(11) 40,42,44.Źródło: Bobbin

Interorganizational coordination in a global supply chain: an empirical study of the U S. Apparel industry. 1997.Źródło: Engineering focus

Product Line Characteristics as Determinants Of Quick Response Implementation For U.S Apparel Manufacturers. Author(s) Ko, Eunju Kincade, Doris H. Clothing And Textiles Research Journal. 1998 V 16 n 1 11Źródło: Uncover

Scheduling Flexible Manufacturing systems for Apparel Production Tomastik, R. N. 10/01/1996 IEEE Transactions on Robotics.Źródło : Uncover

Implementation of a dynamic scheduler for apparel computer integrated manufacturing systems. April 1997.Źródło: Engineering focus

Supply chain management for quick response in the clothing industry. 1996.Źródło: Engineering focus

An intelligent environment for flexible apparel production. 1996.Źródło: Engineering focus

A computer-supported methodology for requirements modeling in CIM for small and medium size enterprises: a demonstration in apparel industry. Jan - Aug. 1997.Źródło: Engineering focus

Intelligent task planning and program generation for robots in automated clothing manufacture. 1994.Źródło: Engineering focus

Automated stock and production control in the garment industry: a case study.1988.Źródło: Engineering Focus

Real time production control Tait, N. Dunton Bassett, UK . Apparel International, Oct 1993 (Oct), 3,5,6,7.Źródło: British Library

Mathematical programming models for cutting-stock problems in the clothing industry Jan. 1988.Źródło: Engineering focus

Optimization-based scheduling of flexible manufacturing systems for apparel production 1995.Źródło: Engineering focus

Study on the integration approaches to CAD/CAPP/FMS in garment CIMS. 1995Źródło: Engineering focus

Design and scheduling of apparel manufacturing systems with both slow and quick production lines. 1994.Źródło: Engineering focus

A solution procedure for solving the nonrectangular cutting stock problem of the clothing industry using expert knowledge within an intelligent CAD environment. 1994.Źródło: Engineering focus

Study on the production planning of apparel products: determining optimal production times and quantities. Ishikura, H. Kyoto Univ , Japan . Computers & Industrial Engineering, Sep 1994, 27(1-4), 19-22.Źródło: British Library

Production planning. Pogson, D. World Clothing Manufacturer, Mar 1995, 76(2), 28-29.Źródło: British Library

Modernising the cutting room: synchronised production throughout the floor. Disher, M. Clothing World. Mar 1993(48), 12,13,15,16.Źródło: British Library

The cost of making to measure (clothing manufacture). Oct. 1994.Źródło: Engineering focus

No more Guess work: product-line system could save apparel company millions. 23 Sept. 1996.Źródło: Engineering focus

Flexible production systems for the apparel and metal working industries: a contrast study on technologies and contributions. Chen, F.F. Ohio, USA . Int Jnl Clothing Science & Technology. 1998, 10(1), 11-20.Źródło: British Library

Current information technology needs of small to medium-sized apparel manufacturers and contractors. 1 Apr 98. Engineering Focus

Hierarchical production planning: Scheduling in the apparel industry. Bowers, M.R.; Agarwal, A. Knoxville TN , USA . Int Jnl Clothing Science & Technology, 1993, 5(3/4), 36-43.Źródło: British Library

Study of the Production Planning and Scheduling Problem in The Apparel Manufacturing Industry. Phase 2. Final Technical rept. 23 Jun 92-22 Feb 95. 31 Mar 95.Źródło: Engineering Focus

Analysis of Garment Production Methods. Part 2: Comparison of Cost and Production between a Traditional Bundle System and Modular Manufacturing. Final Technical rept. Jan 90 - Jan 92. Feb 92.Źródło: Engineering Focus

CADCAM in the clothing industry. Knox, A Nottingham UK World Clothing Manufacturer. Oct 1994, 75(8), 20-21.Źródło: British Library

CAD, CAM in textiles: the management overview. Knox, A. Nottingham UK . Textile Horizons. Feb 1996, 16(1), 24,26,28.Źródło: British Library

Labour shifting and lot sizing in garment manufacture: a simulation study. 1999.Źródło: Textile Focus

Computer aided process planning systems for apparel industry: CAT for windows and CIM for tailor-making 1998.Źródło: Textile Focus
Czym jest REACH Planner & Scheduler?
Jakie moduły posiada REACH Planner & Scheduler *[PDF]
Korzyści ze stosowania REACH Planner & Scheduler
 
Usługi
Application Development
Application Maintenance
Packaged Application Implementation
Infrastructure Lifecycle Management
Systems Integration
Produkty
REACH CAD
REACH Merchandising Manager
REACH Cut Planner
REACH Fashion Studio
REACH ERP
Productized Services
REACH ERP
REACH Style Manager
REACH Sewing Data Bank
REACH Planner and Scheduler
REACH Quality Assurer
Wyposażenie
REACH Digitizer
REACH Pen Plotter
REACH Inkjet Plotter
REACH Cutter Plotter
REACH Digipen
BPO Services
Pattern Engineering
Grading
Lay Planning
Plotting
Digitizing
Usługi konsultingowe
IT Consulting
Soft Goods Consulting
   
  Zamów Demo
  Zadzwoń

Studium przypadku

REACH - Kontakt

Ph   : +91-80-65996111 / 12
Fax  : +91-80-26585744
info@reach-tech.com

© REACH Sewn Technologies and Consulting Pvt. Ltd., 2008. Wszystkie prawa zastrzeżone.